You are here

12 Sep 2008 - R/V Wecoma (W0809B) - Leg 1

Wecoma configured for Leg 1:
* Radiation Van installed on 01 deck
* Boom mount installed on the port side
* Gifford block mounted on A-frame for mooring work
* The -80 degree freezer installed in dry lab
* A -20 degree freezer installed in wet lab

Added to ship flow through system:
* CO2 - Wiley Evans
* Alkalinity - Robert Hart

Loaded equipment for mooring deployment at NH-10:
* "Lodgepole" buoy
* Mike Kosro's ADP buoy
* 2 anchors (a 1 railroad wheel & a 3 railroad wheel)

Other scientific instrumentation:
* Tim Cowles mounted his 600 kHz ADCP on the boom
* An ISUS from Ricardo Letelier installed on ship CTD, using external battery pack