You are here

25 May 2009 – SATURN-04 survey.

At around noon we crossed back into the estuary, conducted a CTD cast at SATURN-03, and continued up the estuary to an anchor station just off Tongue Point on the south bank of the channel at river mile 17 (RM-17). We began hourly CTD casts at 1400 and collected water for nutrients, POC/N, SPM, and DOC each hour beginning at 1200.